Fabrication Nova Nova Light Weight Door Handles September 13, 2010 / March 24, 2016 by John Heard More slow but steady progress during September on ol' Blue. After removing in excess of 50 lbs of "stuff" out of the doors I needed a way to open them. So I fabbed up these door handles which are somewhat like those people use in fiberglass doors. Read more » 1971 Nova Door Handles Firewall True Ten Five
Fabrication Nova March Project Update March 10, 2010 / March 18, 2010 by John Heard Ol’ Blue is at the chassis shop getting a new 25.5 Cage installed right now and several other top secret upgrades. Riffel Motorsports is doing the work and I’ll probably post some progress pics here next time I get a chance to take a look at how it’s going. While I’ve been waiting, I’ve been […] Read more » Air Powered Parachute Launcher Battery Mount
Fabrication Braided Hose Fitting Installation March 27, 2009 / March 27, 2009 by John Heard I ran across some great videos on how to install braided hose fittings – http://link.brightcove.com/services/player/bcpid1431564069?bclid=1432781645&bctid=4470821001 This is the way I’ve been doing it for some time, but I did pickup something I want to try next time I’m making hoses. EAA also has some more real handy video tips on the site, definately worth a look… Read more » Plumbing Race Car Fabrication Stainless Braided Hose Fittings